Shrewsbury and Birmingham Railway






Dates

01/06/1849[Shrewsbury and Birmingham Railway]
Admaston opened
01/06/1849[Shrewsbury and Birmingham Railway]
Abbey Foregate opened
  /  /1900[Shrewsbury and Birmingham Railway]
Abbey Foregate renamed Abbey Foregate Platform
30/09/1912[Shrewsbury and Birmingham Railway]
Abbey Foregate Platform closed
30/06/1952[Shrewsbury and Birmingham Railway]
Admaston renamed Admaston Halt
07/08/1964[Shrewsbury and Birmingham Railway]
Admaston Halt closed

Locations along the line

These locations are along the line.








Empties from Ironbridge Powerstation are held at Madeley Junction. The Shrewsbury-Wolverhampton line is being partly resignalled. View looks west. ...
Ewan Crawford 13/09/2006


Signal box at Cosford on the line between Wolverhampton and Shrewsbury, photographed in 2003. ...
Don Smith //2003
Coal empties passing east through Cosford in 2006. ...
Ewan Crawford 15/09/2006
Interior of Cosford SB in 2003. ...
Don Smith //2003
Resignalling at Cosford in September 2006. View is south east towards Wolverhampton. ...
Ewan Crawford 15/09/2006