Bairds and Dalmellington Limited

Introduction

This is the forth phase of the Dalmellington company.






Dates

  /03/1980[Ayr and Dalmellington Railway][Bairds and Dalmellington Limited]
Last train, preserved locomotive and wagons, runs from Cutler Sidings to Minnivey. Cutler Sidings (excluded) to Minnivey (excluded) closed and lifted.
  /  /1988[Bairds and Dalmellington Limited]
Track re-laid from Dunaskin to Chalmerston Loading Pad. Dunaskin washery sidings lifted. Connection made to preserved line at Minnivey.