Millerhill EGIP Depot

End of the road. The extension to the new road built during 2014/2015 to serve the Biogen plant at Millerhill now reaches a point alongside the under-construction Edinburgh & Midlothian Recycling & Energy Recovery Centre. View south showing the limit of construction on 10 June 2018, with the RERC off to the right and the well occupied ScotRail EMU depot visible in the background beyond the goods lines.

Location: Millerhill EGIP Depot

Original line: Edinburgh and Dalkeith Railway

Photographer: John Furnevel

Contact photographer: John Furnevel

Contact editor

Date: 10/06/2018

Image number: 64537


Other photographs of Millerhill EGIP Depot on RailScot