document.write('');document.write('');document.write('');document.write('');document.write('');document.write('


A southbound service on the ex-GSWR route about to run over Holywood level crossing on 10 June, heading for its next stop at Dumfries. This is one of the very few level crossings that is manually operated from the box by wheel.
David Forbes [10/06/2009]


Holywood signal box in January 2006, looking west over the crossing.
John Furnevel [31/01/2006]


The level crossing and signal box at Holywood, on the G&SW route north of Dumfries, seen here looking east on 10 June. Holywood is one of the reducing number of crossings in the UK where the gates continue to be operated manually by the signalman, using a wheel located within the box.

David Forbes [10/06/2009]
All photographs of Holywood
');