The Waverley trackbed at Falahill on 13 April 2014, looking north towards Tynehead.
John Furnevel [13/04/2014]


Overbridge leading to Cowbraehill farm, between Falahill and Tynehead looking North. This 1849 structure is due for demolition as part of the Waverley line reconstruction. As of May 2009, a temporary road had been constructed to serve Cowbraehill in the interim. A new structure is due to be built here.
James Young [14/03/2007]


A class 08 hauled track recovery train rumbles north in rapidly fading light towards Falahill Summit in this rare January 1972 view, photographed during the penultimate phase of track lifting along the Waverley Route.
David Spaven [/01/1972]