document.write('
17/10/1861Inverness and Perth Junction RailwayFirst sod cut.
22/7/1861Inverness and Perth Junction RailwayAct obtained for a line between Dunkeld and Forres, and Ballinluig to Aberfeldy. Engineer: Joseph Mitchell.
//1863Perth and Dunkeld RailwayInverness and Perth Junction RailwayPerth and Dunkeld Railway absorbed by Inverness and Perth Junction Railway (Also given as 1864, 28 February).
1/6/1863Inverness and Perth Junction RailwayDunkeld to Pitlochry opened. Dunkeld (Perth and Dunkeld Railway) becomes a through station (the north wall of the overall trainshed was removed).
3/8/1863Inverness and Perth Junction RailwayForres to Aviemore opened.
All dates for Inverness and Perth Junction Railway
Search chronology:
');